New $278-million Mosaic Stadium to replace Saskatchewan Roughriders’ home ground



Linkedin
Twitter

New $278-million Mosaic Stadium

Work is under way on a new stadium in Regina, which aims to put the capital city of the Canadian province of Saskatchewan on the international stage. The new $278-million Mosaic Stadium will replace another stadium bearing the same name, but located in a different part of the city, as the home field of the Canadian Football League’s Saskatchewan Roughriders.

Designed by HKS Architects Inc, preliminary construction on the new stadium began in early 2014 and is expected to be completed by August 2016. The Roughriders will move into the stadium for the 2017 CFL season.

On May 22, 2014, Regina revealed the first look of the 33,000-seater stadium, which is intended to provide a more modern fan experience. It will be an open-air stadium consisting of a sunken bowl with a partial roof around much of its rim, designed to shield spectators. The rim’s curved design will prevent snow from accumulating on the roof. The stadium will be built to support the construction of a full roof in the future.

The south end zone will not be covered by the roof, allowing a view of downtown Regina. To protect spectators from wind, the lower bowl will be located 10 metres (33 ft) below ground level. The stadium will individually seat 33,000 spectators, and can be expanded to seat up to 40,000 with temporary seating. 38 corporate suites and two levels of luxury seating will also be provided. The stadium will also feature an open concourse, circling the entire stadium.

The designer behind the new stadium, Mark Williams of HKS Architects, says the stadium compares ‘pound for pound’ with the company’s other projects, which include three NFL stadiums: Lucas Oil, AT&T and the under-construction Minnesota Multipurpose. Williams has expressed in media interviews that while designing the stadium, he kept the interests and passion of the fan base close at heart, hoping to convey the ‘raw energy’ of Rider Nation in the build.

The $278 million funding will be provided by multiple sources; the government of Saskatchewan will provide a grant of $80 million, and a $100 million loan to be paid off through ticket surcharges. The city will provide $73 million in funding, which will be subsidized through property tax increases. The remainder of the budget will be covered by the Roughriders themselves, primarily through naming rights.

Watch 500+ member-exclusive videos with valuable tips for your venue



« Previous News:
» Next News:




Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement


Advertisement

More News

Live Nation, Oak View Group and Plenary and Webuild to build and operate new Brisbane Arena

Gather Brisbane selected to deliver $1.4bn Brisbane Arena

Published: November 17th, 2026

The Gather Brisbane consortium has been chosen to deliver the new A$1.4 billion (US$925m) Brisbane... » Read more

Third phase of Barclays Center redevelopment is completed

‘Distinct Experience’ Barclays Center third phase rejig over

Published: November 17th, 2026

Debuting ahead of the Brooklyn Nets’ 2026-2027 National Basketball Association (NBA) seasons,... » Read more

European Athletics Championships to be held in Helsinki

Spiffy-infrastructure-Helsinki to host European Athletics show

Published: November 17th, 2026

The European Athletics Championships will be held at the Helsinki Olympic Stadium in Finland in... » Read more

They want to keep the Bears in Chiago with a new $10bn mixed-use development

$10bn mixed-use sprawling destination bait to stop Bears’ flight

Published: November 17th, 2026

The National Football League (NFL) team Chicago Bears (US) could be handed a spectacular new... » Read more


Receive global sports venue NEWS five times a week in your inbox