New phase of Bridgestone Arena renovation project begins



Linkedin
Twitter

Bridgestone Arena renovation started Image: Nashville Predators

The National Hockey League’s (NHL) Nashville Predators have put their skates on for the next stage of their Bridgestone Arena renovation project.

NHL.com said ‘Smashville’s Next Stage: Broadway 2030’ project will transform the venue into a best-in-class destination for patrons, performers and athletes. The enabling phase of is now officially underway.

Building on a longstanding commitment to keeping the venue modern and competitive, the organization will continue a series of offseason upgrades designed to enhance the fan experience while laying the groundwork for the arena’s larger-scale renovations scheduled for the summers of 2027, 2028 and 2029.

The renovation, which will be completed in phases so games can continue without interruption, has a goal of having the majority of the work being completed by the 2029-30 season, with the Predators organization leading and funding the project.

The Nashville Predators are a professional ice hockey team based in Nashville, Tennessee (US). The Predators compete in the National Hockey League (NHL) as a member of the Central Division in the Western Conference.

The 17,159-capacity Bridgestone Arena is a multipurpose indoor arena in downtown Nashville, Tennessee, United States. Completed in 1996, it is the home of the Nashville Predators of the National Hockey League (NHL).

Predators and Bridgestone Arena Chief Strategy Officer Kyle Clayton said, “We’re excited to be starting this process this summer by getting the arena ready for its next stage.

“This three-to-four-year journey that we are about to embark on is going to be incredible as we transform Bridgestone Arena into a best-in-class venue for patrons, players and performers.

“As we begin this process, we invite our fans to give their ideas and input of what they’d like to see in the future. This is their home, and we want them to be a part of this project.”
 

Fan experience upgrades

This offseason, the primary focus of the Bridgestone Arena renovation project will be improving connectivity throughout the building.

The arena’s south entrance along Demonbreun Street will be upgraded with new escalators, providing seamless access to all four public levels.

The current staircase, which serves only the main concourse, Gary Force Acura Club Level and Bud Light Upper Level, will be removed and replaced with a system that also connects fans to the Nicholas Air Suite Level, which is home to the arena’s luxury suites, California Closets Studio and BetMGM Sports Lounge.

This project will also include extensive concourse enhancements, such as the creation of new landing areas and updates to concession offerings on the Gary Force Acura Club Level and Bud Light Upper Level.

These improvements directly respond to fan feedback calling for better circulation and ease of movement throughout the venue.

As part of preparations for future renovations, the box office located at the Nissan SoBro Entrance will also be expanded.

This enhancement will improve customer service in the short term while playing a critical role during the Broadway-facing renovations beginning in the summer of 2027.

As those projects progress, the current main box office near the primary Broadway entrance will be reduced in size to accommodate future development.
 

Ice cool in Nashville

As part of ‘Smashville’s Next Stage: Broadway 2030’ developments and in addition to guest-facing upgrades, the arena will undergo critical mechanical improvements that can only be completed during the offseason.

Among these is the modernization of the arena’s ice plant control system, marking the first phase of a three-year initiative to fully replace and upgrade the facility’s ice plant infrastructure.

The new ice plant equipment is scheduled for installation in the summer of 2027, followed by a full ice floor replacement in the summer of 2028. Together, these investments will ensure a world-class playing surface and optimal conditions for the Predators.

The security and entry experience will be improved as part of the Bridgestone Arena renovation project with the installation of Evolv’s latest screening technology, Xpress 2.0.

This upgrade builds on the team’s existing partnership with Evolv and further advances a frictionless, efficient entry process.

Earlier this spring, Bridgestone Arena became the second NHL venue to introduce Evolv’s Expedite X-ray system, which significantly increases screening speed compared to traditional methods.

The Predators said, “These continued investments underscore the organization’s commitment to getting fans into the building quickly and safely.

“The organization will also continue to elevate one of the NHL’s premier game presentation experiences, with plans to further enhance the in-arena atmosphere and overall entertainment offerings for fans.”

Continue following Coliseum for the latest updates on sports venues, stadiums and arena business news worldwide.

Coliseum is dedicated to building a global community of sports and entertainment venue professionals helping create better and more profitable venues.

Become a member of the Global Sports Venue Alliance and connect with stadiums, arenas and industry experts from around the world. Apply for membership through the Global Sports Venue Alliance and access the 365Coliseum Business platform.

Watch 500+ member-exclusive videos with valuable tips for your venue



« Previous News:
» Next News:




Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement

More News

Favourable arena design presented in Nuernberg

FC Nürnberg selects preferred option for stadium renovation

Published: July 8th, 2026

German 2. Bundesliga club 1. FC Nürnberg has presented a preferred option for its... » Read more

Luke Harrison at Coliseum Europe 2026

BDP Pattern pull off El Campín Stadium project challenges

Published: July 8th, 2026

Luke Harrison is in a top-notch role with BDP Pattern, UK. He says that the architecture firm... » Read more

Lighting upgrade at DHL Stadium in Cape Town

South Africa DHL Stadium venue lighting benchmark across Africa

Published: July 8th, 2026

The DHL Stadium in Cape Town, South Africa, has reached a remarkable milestone by becoming the... » Read more

Le Havre AC stadium Stade Océane naming rights

Le Havre AC-CMA CGM naming deal to reinforce club’s growth

Published: July 8th, 2026

The Ligue 1 team Le Havre AC’s hunt for a naming rights partner for their home stadium – the... » Read more


Receive global sports venue NEWS twice a week in your inbox